LaFleur Minerals Advances Gold Production Restart in Quebec's Abitibi Greenstone Belt

LaFleur Minerals is progressing toward restarting gold production at its Swanson Gold Project in Quebec's Abitibi Greenstone Belt, with a 7,500-meter drill program showing promising near-surface intercepts and a fully permitted mill positioned to process material from the district-scale site.

October 24, 2025
LaFleur Minerals Advances Gold Production Restart in Quebec's Abitibi Greenstone Belt

LaFleur Minerals Inc. is advancing toward restarting gold production operations at its Swanson Gold Project located in the globally recognized Abitibi Greenstone Belt of Quebec. The company's progress represents a significant development in the Canadian mining sector, particularly given the strategic positioning of its assets and the advanced stage of infrastructure already in place.

The company is currently conducting a 7,500-meter drill program that has already yielded assay results showing multiple mineralized zones with favorable conditions for a near-surface, open-pit operation. These results indicate high-grade intercepts that support the economic viability of the project. The ongoing drilling operation provides critical technical information needed to guide future dig operations and supports the completion of a Preliminary Economic Assessment.

LaFleur's position is substantially de-risked by the existence of a fully permitted tailings storage facility and gold mill capable of processing over 750 metric tons per day. This infrastructure is located just 60 kilometers from the Swanson Gold Deposit, which will serve as the primary source of mineralized material. The proximity of processing facilities to the deposit site reduces transportation costs and operational complexity, enhancing the project's economic potential.

The company has consolidated claims around its now district-scale 18,304-hectare Swanson site, creating a substantial land package in one of Canada's most prolific gold regions. Production at the nearby Beacon Gold Mill will begin with a de-risked bulk sample from Swanson, while further expansion following mineral structures across the site remains a potential option for future growth. The strategic consolidation of claims positions LaFleur to potentially develop multiple mining operations within the same geological system.

All scientific and technical information has been reviewed and approved by Louis Martin, P.Geo., Exploration Manager and Technical Advisor of the company, who is considered a Qualified Person for the purposes of NI 43-101. The latest news and updates relating to the company are available in its newsroom at https://ibn.fm/LFLRF. Additional information about the communications platform covering this development can be found at https://RocksAndStocks.news.

The advancement of LaFleur's gold production restart comes at a time when gold prices remain strong and demand for secure gold supply chains continues to grow. The project's location in Quebec, a mining-friendly jurisdiction with established infrastructure, further enhances its prospects for successful development and long-term operation.